Test - capacity reduction on VIP THE-ZTP

03.06.2022 18:00

This is a test

Reduction of gas capacity on VIP THE-ZTP due to flood in border station

The capacity is reduced to 0


  22060321X-BE-A-A0A0A-Y-01_002
  Active
  Transmission system unavailability
  03/06/2022 16:00:00
 05/06/2022 06:00:00
 Unplanned
 Due to a flood, the interconnection with THE is unavailable
  03/06/2022 17:36:00
  KWh/d
  0
  100000000
  100000000
  VIP THE-ZTP
  21Z102938475601E
  new stop time

Download xml.
Back to overview